Kitchen fitting and renovation

We take out the old kitchen and fit the new one, with plumbing, electrics, plastering, tiling and decorating all included. One team and one fixed price.

Guide price
From £7,500€9,000
Time on site
2–4 weeks
Your quote
Fixed, in writing
Grey shaker-style kitchen with a large island, pale stone worktop, three pendant lights and oak flooring

What’s included

Everything needed to finish the job

All of this is in your quote as standard.

  • Home visit, measure-up and a layout drawn to your room
  • Careful strip-out, with the old kitchen taken away
  • Plumbing, gas and electrics moved to suit the new layout
  • Plastering and making good, so walls are flat before units go on
  • Units, larders and islands fitted, levelled and scribed in
  • Worktops in laminate, timber, quartz or granite
  • Splashbacks, wall tiling and flooring
  • Appliances installed, tested and certified
  • Decorating, so the room is finished, not just fitted

What we can build

Types of kitchen project

Full supply and fit

We design the layout with you, supply the units, worktops and appliances, and fit the lot. One order, one price, one warranty trail.

Fit-only

Already chosen a kitchen from a showroom? We do everything around it: strip-out, services, plastering, fitting, tiling and decorating.

Kitchen-diner knock-through

Taking a wall out to join two rooms. We bring the structural engineer, fit the steel, deal with Building Control and make good both sides.

Kitchen in a new extension

Building out and fitting the kitchen as one project means the drains, sockets and rooflights end up exactly where the kitchen needs them.

Timeline

How long it takes

A straightforward kitchen is two to three weeks on site. Stone worktops, new flooring or a knock-through push it towards four.

  1. Before we start

    Design and order

    Layout agreed, fixed quote signed off, units ordered. Most kitchens arrive three to six weeks after ordering, so we book your start date around delivery.

  2. Days 1–3

    Strip-out and first fix

    Old kitchen out. Pipes, gas and cables moved to their new positions while the walls are bare.

  3. Days 4–6

    Walls and floor

    Plastering, making good and any new subfloor. This is the dusty part, and we screen it off.

  4. Week 2

    Units in

    Cabinets fitted and levelled. Stone worktops are templated now and take about a week to cut.

  5. Week 3

    Worktops, tiling, second fix

    Worktops down, sink and hob connected, tiling done, appliances commissioned.

  6. Final days

    Decorate and hand over

    Painting, sealing, a snag walk-through with you, and your certificates and manuals in one folder.

Guide prices

What does a kitchen cost?

Typical ranges for a fully finished job. Your own price is fixed in writing after a free visit.

Estimate my cost
Mid-range finish, fully completed
CompactGalley or small L-shape, up to 8 units£9,000€11,000 – £14,000€17,000
MediumTypical family kitchen, 10–14 units£14,000€17,000 – £22,000€26,500
LargeOpen plan or with an island£22,000€26,500 – £35,000€42,000

Guide ranges include VAT. A guide only: access, ground conditions and the fittings you choose all change the figure.

Planning and approvals

Do I need permission?

Show the rules for

No planning permission is needed. If a wall comes out, Building Control signs off the structural work. Gas work is done by Gas Safe registered engineers, and electrics are tested and certified.

No planning permission is needed. If a wall comes out, a structural engineer certifies the work. Gas work is done by RGI registered installers and electrics by Safe Electric registered contractors.

A guide, not legal advice. Conditions apply, and listed buildings and conservation areas are different. We check your home and confirm in writing.

FAQs

Kitchens questions

How long will we be without a kitchen?

Usually two to four weeks. Where the layout allows, we set up a temporary sink and a bit of worktop so you can still make a cup of tea and wash up, and we tell you before we start which days the water or power will be off.

Can you fit a kitchen we have bought somewhere else?

Yes. Plenty of our customers choose their units from a showroom and ask us to do everything else. We check the supplier’s plan against your actual room before anything is ordered, because that is where most kitchen problems start.

Do you move gas pipes and electrics, or do I need to book someone?

We do it. Gas work is done by Gas Safe registered engineers and electrics are tested and certified to BS 7671. It is all in your quote and you get the certificates at handover.

We do it. Gas work is done by RGI registered installers and electrics by Safe Electric registered contractors. It is all in your quote and you get the completion certificates at handover.

Why do stone worktops take longer?

Quartz and granite are cut to a template taken after the units are fitted, so the joints and cut-outs are exact. Cutting takes about a week. We fit a temporary worktop in the meantime so the kitchen is usable.

Can we keep our existing appliances?

Yes. Tell us what is staying and we design around it, then disconnect, store and refit it.

How much does a new kitchen cost?

It depends mostly on size, worktop material and whether the layout changes. The estimator on this site gives you a realistic range in a minute, and your written quote after a home visit is fixed.

Free, no obligation

Get a free kitchen quote

Fill in the form and we will get back to you within one working day to arrange a free visit.

  • Free home visit
  • Fixed price in writing
  • No pressure